Idaho Transportation Department
About Us Travel Services DMV Public Involvement News and Information
ITD Home News and Info Contact Us
 

East Idaho Southeast Idaho South-Central Idaho Southwest Idaho North-Central North   North Idaho
  North-Central Idaho
  Southwest Idaho
  South-Central Idaho
  Southeast Idaho
  East Idaho

ProjectsIdaho Transportation BoardIdaho Transportation Investment ProgramMetropolitan Planning OrganizationsLocal Highway Technical Assistance CouncilNatl. Environmental Policy Act (NEPA)
ITD Projects D3 Idaho 16, U.S. 20/26 to Idaho 44

Idaho 16, U.S. 20/26 to Idaho 44


Project Facts

Project Number: A011(236)
Key Number: 11236

The Idaho Transportation Department (ITD) is performing design work for a new highway extending Idaho 16 from U.S. 20/26 (Chinden Blvd) to Idaho 44 (State Street). This project will require a new Boise River crossing and a connection with Idaho 44 across undeveloped property.

Description

The new highway will provide a north-south connection in the Treasure Valley between US-20/26 (Chinden Blvd) and SH-44 (State St). It is the first step toward extending Idaho 16 south from its intersection with Idaho 44 to connect with I-84.

The project will include:

  • New four-lane highway from U.S. 20/26 to Idaho 44.
  • Bridges across the Boise River and Phyllis Canal.
  • At grade signalized intersections at US-20/26 and SH-44
  • Access consolidation and new local roads
Background

An environmental study began in 2006 to locate the new extension of Idaho 16. The study produced an Environmental Impact Statement (EIS) that identifies the alignment. Click here to learn more about this study.

Schedule and Funding

Final design and right-of-way are scheduled for completion in August 2011.

Right-of-way is expected to be complete by October 2011.

The Record of Decision was approved by FHWA on April 14, 2011. At this time, construction is expected to begin in January 2012.

This project is funded through the GARVEE Transportation Program. Grant Anticipation Revenue Vehicle (GARVEE) bonds allow the accelerated construction of critical highway and bridge projects throughout the state of Idaho. Design & right-of-way are funded through prior year authorizations. Under the 2011 legislation session, addition funding has been authorized for construction of this project.


Compliance with Title VI of the Civil Rights Act
The Idaho Transportation Department (ITD) is committed to compliance with Title VI of the Civil Rights Act of 1964 and all related regulations and directives. ITD assures that no person shall on the grounds of race, color, national origin, gender, age, or disability be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any ITD service, program, or activity. The department also assures that every effort will be made to prevent discrimination through the impacts of its programs, policies, and activities on minority and low-income populations. In addition, the department will take reasonable steps to provide meaningful access to services for persons with Limited English Proficiency.




Contact Us
comments@itd.idaho.gov
P.O. Box 7129 • Boise, ID 83707-1129
Ph: (208) 334-8119 • Fax: (208) 334-8563
TDD: (208) 334-4458


News Releases
Project Photos
Materials
Archived

Please click on the link below to download a .zip file of the project materials.

Idaho 16 Archives

 
ITD Public Involvement
comments@itd.idaho.gov
P.O. Box 7129
Boise, ID 83707-1129
Phone: (208) 334-8938
Fax: (208) 334-8563
TTY/TDD Users: Dial 711 or
(800) 377-3529 to use Idaho Relay System


Page Last Modified: 10/19/2012 2:23:01 PM

About Us | Traveler Services | DMV | Projects | News And Info| Privacy & Security
Idaho Transportation Department
3311 W. State Street P.O. Box 7129
Boise, ID 83707-1129
(208) 334-8000